Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

Sue needs 2 1/3 cups of flour for a batch of cookies. How many complete batches can she make with 10 cups of flour?
what is the answer for 12a-a
David opens a bank account with $140 and then deposits $150 each month. Louis opens a bank account with $260 and deposits $120 each month.  How many months will
Paula invested in two accounts; one pays 3% simple interest and the other pays 6% simple interest. She invested $5000 more in the account paying 6% than in the
the amount of kinetic energy a moving object has depends on its mass and its
Juliette is driving her car when she sees a cat run across the road. If she is able to stop the car over a distance of 0.025km in 2.5 s, what is her average acc
this is in my homework paper 5300 divided by 10 to the second
Can you show me how to divided 33 into to two groups so the ratio is 4 to 7 show me all the work
what is an direct object
What is the climax for Rikki Tikki Tavi