alyssaaaaaa1 alyssaaaaaa1
  • 02-05-2017
  • Mathematics
contestada

it takes three days for a construction company to prepare a model of a building for their client . how many full models can they prepare in 86 days

Respuesta :

Nadia2004
Nadia2004 Nadia2004
  • 02-05-2017
they would create 28 full models
Answer Link
Bea1111 Bea1111
  • 02-05-2017
You divide 86 by 3 to get the answer.
Answer Link

Otras preguntas

what type of triangle is 4.5.6
what dose this equal 2(6x-4)=3(6x+2)
Read the introduction and the writing prompt. Then, identify the format, topic, audience, and purpose of the assignment. Format:____ Recall “Response to Executi
What area would most likely experience the greatest amount of natural erosion?
Pls answer all :D tysmm ill mark brainliest
a liquid that occupies a volume of 5.0L gas a mass of 6.0 kg. what is the density of the liquid in kg/L?
show the distribution pf natural vegetation in an outline map of nepal​
The crop that became the staple of life in mexico and south america was.
Supplies, clutter and __________ are common tripping hazards in a shop environment.
How do i write the expression in expanded form, and then evaluate? (2/3 to the power of 2)