emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

8 times 51 show your work
For the fair the organizers ordered 32 rolls of tickets each roll of tickets has 100 tickets how many tickets were ordered in all?
Brandon owns nearly 2 times as many CDs ads Ingrid. Brandon owns 56 CDs. Write an equation and use it to estimate the number n of CDs Ingrid owns.
The 10th and the 20th term of an arithmetic sequence are 10 and 40, respectively. Find its 100th term.
The moon is about 240,000 miles from Earth period what is the distance written as a whole number multiplied by a power of 10
If a line has no y-intercept, what can you say about the line?
change 0.025 , 0.00003 , 0.00197 to scientific notation
what is m/9 - 1 = -2 whats the answer & steps
1/4(12x+16)=10-3(x-2) anyone?
By tradition, when does the presidential campaign begin?