hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

what did frenchtown change its name to after the war of 1812
9 is what percent of 45? Use the table to find the percent. Shirts Sold 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 45 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 9 is I pe
simplify 7x7⁴????????​
Which disease or disorder affects the lower respiratory system? Tuberculosis, laryngitis, sinus-itis, the common cold. ANSWER: A) Tuberculosis
identify the constant of proportionality2/33/236​
Why do you think the fighting between Americans and Japanese was so intense?
trying to figure out how to solve the problem​
Which number represents the country of Brazil 2 1 4 3
how many paragraphs does a narrative essay need? :’)
On the number line, which point is the closest pi .A.B.C.D. ​