A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

HELP PLS!! D: The net of a rectangular prism is shown below. What is the total surface area of this prism? A. 112 cm² B. 142 cm² C. 105 cm² D. 71 cm²
Write an equation for the situation then solve for x. Julio rented a bike from Krystal's Bikes. It cost $13 plus $2 per hour. If Julio paid $17, then he rented
yo help me do this asap pls​
help please u can choose more than 1
hi do u know what the total marks is it:-A+Aplz tell me plz ​
what are the elements required for photosynthesis what are the products​
Viruses are resistant to which of the following
Find the distance between the points. (9.7, -2.1), (-3.2, 8.1)
What is the pH of a 2.50×10^-4 M solution of sodium hydroxide
State the relative position for the earth and sun in a lunar eclipse (in a partial and total eclipse)