kyliepugh19001 kyliepugh19001
  • 02-01-2021
  • Business
contestada

If members of a project team report formally to a functional manager (not directly to the project manager) what type of organization is it

Respuesta :

tilermaelee
tilermaelee tilermaelee
  • 02-01-2021

Answer:

Matrix organization

Explanation:

Hope this was helpful! Have a good day

Answer Link

Otras preguntas

Which word should not be hyphenated to fit on a line? A. charge B. automatic C. divided D. register
What number is 10,000 less than 337,676?
think about a bush in your back yard, is the bush alive according to the characteristics of life? why or why not?
The basic requirements for industry growth are capital natural resources and workers true or false
If the flour to sugar ratio is 5 cups flour to 1 cup sugar, then how much sugar is needed if only 2 cups of flour are used? (Give the answer as a fraction)
Which of the following are incorrectly capitalized? doctor Nelson Appalachian mountains ethiopian cuisine uncle Pauly algebra I T.S. Eliot society
Acid precipitation is caused by a mix of what?
Why did the U.S. support Saddam Hussein and Iraq in the war against Iran in the 1980s? A. The U.S. considered Iran's militant Islam a bigger threat. B. Iraq thr
A child of weight 250 N climds 1.5 metres up a rope ladder in 5 seconds. Calculate the: A. work done B. power of the climb
Which is a fused sentence? I love drawing because it exercises my imagination. Our pet poodle loves to sit on our laps and take long naps. Pablo took a music cl