how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

If a bacterium could divide into two every 20 how many bacteria would be produced after eight hours?
Describe the acceleration of the cart shown. Assume there is no friction. A) The cart will eventually move to the left at constant speed. B) The cart will even
Use the net to find the lateral area of the prism.
What is Sal's weakness in Walk two Moons?
How much of the earth's surface do glaciers cover? please give answer in percentages. thank you!!!
Solve the equation. 5y – 1 + y = 34 + 4y – 5y
What would be the Best response to the question,” How did the Thames help the United Kingdom flourish?” A.))Read an excerpt from one of Edmund Spenser’s poems a
i need to know which one is wrong
An animal's somatic cells contain 2n chromosomes. What happens to the number of chromosomes in the animal's gametes ? A) The number is increased to 4n by mitosi
indicate why the small intestine needs an extensive internal surface area