jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

What element is in period 4, group 12?
1+0.9+0.08+0.001 Somebody can help me please
A barbar wants to set up a salon in a room measuring length of 3m by 3m .He has a simple wooden chair,3 large mirrors and one bulb . a) using the knowledge of s
Which of the following was not a title taken by Augustus? O Pontifex maximus O Princeps O Augustus O Emperor O None of these
The amplitude of a mechanical wave shows _____. A. how fast the wave is moving B. how many waves pass a given point in one second C. how many seconds it takes a
True or false everyone in the colonies could vote
What is the length of BD? What is the length of segment AC? What is the area of the triangle ABC?
spade realty sold lots for $23240 per hectare . what is total sales values if the lots in hectare were 2,3,4 ?
600+39 what does it add up to help
Convert the population of Texas to Scientific notation. There are 28,000,000 people living in Texas.