p3achq
p3achq p3achq
  • 14-05-2020
  • Mathematics
contestada

Miguel worked 5 days last week. If he worked 7.2 hours on average each day, how many hours did he work for the week?

Respuesta :

salatulmaghrib
salatulmaghrib salatulmaghrib
  • 14-05-2020
Multiply the hours per day by the number of days.

7.2*5=36 hours total
Answer Link

Otras preguntas

Find the equation of line
which two islands are closest to the mainland asia?
name two drugs that work to cause change in the nervous system
a bag of popcorn contains 483 calories and servers 3.5 people. how many calories are in each serving.
Identify which functions are linear or non-linear. A. f(x) = x2 + 1 B. f(x) = 2x + 5 C. f(x) = x 2 + 3 D. f(x) = 3 x + 7 E. f(x) = 4x + 10 2 - 5
From which layer of atmosphere is the top layer of the thermosphere? A.troposphere B. Stratosphere C.mesosphere D.exosphere Hurry Help Me I will give a brainei
explain how you can use the Associative Property to evaluate (7x50)x4.
What were major causes of the dust bowl apex
Ella el vestido con la blusa
A 80​-foot piece of siding is cut into three pieces so that the second piece is four times four times as long as the first piece and the third piece is five ti