seppy36
seppy36 seppy36
  • 13-05-2020
  • Mathematics
contestada

A construction company can remove 934 metric tons of dirt from a construction site in 412 hours.
What is the unit rate in metric tons per hour?

Write your answer as a fraction or a mixed number in simplest form.

Respuesta :

aksh2007
aksh2007 aksh2007
  • 14-05-2020

Answer:

2.27

Step-by-step explanation:

Answer Link

Otras preguntas

Earth has roughly _________ times more atmospheric pressure than mars
what is Dido and Aeneas?
I NEED HELP REALLY BAD COME QUICK!!! At summer camp, campers were asked to name their favorite sport. The circle graph shows the percent of campers who preferre
Is the triangle with the side lengths 5,12,13 right, obtuse, or acute? Why?
How do currents affect climate and weather.??
For the first 150 years of its history, the united states avoided becoming involved with other countries. what is this policy called? nationalism radicalism iso
is this a complex sentence? the governor chose the best people whom he could find for the committee; Mr. Dobbs was appointed committee chairman.
Where does the water come from in a neutralization reaction
I need to know if I did the tables right.
Help For number 1 through 14