lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

Horace read 160 pages in 4 hours. How many pages can he read in 6 hours??
what is the meaning or definition of fighting-gear??
A 4.5 newton object is placed in a tank of water. If the water exerts a force of 4.0 newtons on the object, will the object sink or float?
conversation between Hitler and gandhi
How do u write 6 more the 7 times a number is 41 in algebraic equation??
A history quiz consists of five true-false questions. If you guess on each question, then the probability of answering all five questions correctly is approxima
The neolithic revolution is most closely associated with....
What is the lateral area of the rectangular prism with a base length of 17 m, a base width of 7 m, and a height of 5 m?
A 4.5 newton object is placed in a tank of water. If the water exerts a force of 4.0 newtons on the object, will the object sink or float?
The circumference of a circle is 6.28.What is the area of the circle?