batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

Sam, Joe, Lynn, and Kori are four business colleagues traveling together on a business trip. There are four adjacent seats available on the plane. Kori and Lynn
Find the amount accumulated FV in the sinking fund. HINT [See Example 1.] (Assume end-of-period deposits and compounding at the same intervals as deposits. Roun
7 Choose the correct option Not all /all of birds can fly. The teacher interviewed each /each of student in turn. I’ve heard some/ some of those records , but n
Entifica el estilo narrativo en la siguiente cita: "Para siempre habría de recordar el instante en que hubo de abandonarla. Cada vez que los recordaba, sentía q
A 28-year-old single investor has funds saved at a bank. He contacts an RR and wants to begin allocating funds to a retirement account. What choices is the most
Mark u Braimliest 19 point Read John Muir's "Calypso Borealis" and answer the question. [1] After earning a few dollars working on my brother-in law's farm nea
What is the point-slope form of a line that has a slope of -4 and passes through point (-3, 1)? Oy-(-3) --4(x-1) O y-1--4[*-(-3)] 0 -1-y,--4-3-x;) O 3-y,--4(1-x
√ 19 + 6^2 ÷ 7.2^2 I need help ASAP
Please answer this correctly
Need help with trig in pic